Groundworks Delivered for a New SEND Education Facility

Delivering Comprehensive Groundworks for a New SEND Education Facility

At Fry Site Services, part of Fry Group, we specialise in delivering comprehensive groundworks, civil engineering and external works packages for modular construction projects throughout the South East. One of our latest completed education sector projects involved the delivery of a full groundworks, utilities, drainage and landscaping package for a new eight-bay SEND (Special Educational Needs and Disabilities) teaching block in Farnborough on behalf of our valued client, Reds10.

The completed development provides a modern, safe and accessible learning environment specifically designed to support pupils with additional educational needs. From the earliest excavation works through to the final landscaping touches, Fry Site Services was responsible for delivering the infrastructure required to bring the new facility to life.

This project demonstrates our capability to provide complete turnkey groundworks solutions for modular building developments, whilst also showcasing the additional benefits of working with the wider Fry Group. Through our sister company, RecMat, we were able to provide integrated waste management, aggregate supply and plant haulage services, helping to streamline logistics, improve efficiency and maintain programme certainty throughout the project.

Groundworks SEND Modular Building

Delivering the Foundations for a Successful Modular Construction Project

Modular construction continues to grow in popularity across the education sector, offering faster build programmes, reduced site disruption and improved sustainability credentials. However, no modular building can be successfully installed without quality groundworks and infrastructure beneath it.

For the Farnborough SEND block, our works began with extensive site preparation and reduce level excavation. Before any structural works could commence, the site had to be carefully excavated and graded to achieve the required formation levels for foundations, drainage infrastructure and external play areas.

Using a combination of experienced operators and modern plant equipment, our team carried out the excavation works in accordance with the engineering design. Establishing accurate levels at this stage was crucial to the success of the entire project, ensuring all subsequent works could be completed efficiently and without delays.

Throughout this phase, RecMat supported the programme through the removal of excavated materials, management of waste streams and the delivery of construction aggregates. Having these services available through a sister company provided valuable efficiencies and enabled smooth coordination across the project.

Installation of Thirty-Six Concrete Foundation Pads

Following completion of the excavation works, our attention turned to the construction of the foundation system.
The structural design required the installation of thirty-six concrete foundation pads to support the eight-bay modular building. Accuracy was paramount throughout this stage, as modular construction demands precise tolerances to ensure successful installation of the building units.

Each foundation location was carefully excavated, prepared and checked before concrete was introduced. To maximise efficiency and maintain programme targets, a concrete boom pump was utilised during the pour.
The use of a boom pump allowed concrete to be placed accurately and consistently across all thirty-six foundation locations while reducing manual handling and improving overall productivity.

Once completed, the foundations were left to cure fully before progressing to the next phase of construction. These concrete pads now provide the structural base that supports the entire SEND facility.

Construction of Blockwork Plinths

Following the curing period, Fry Site Services commenced construction of the blockwork plinth system.
The plinths form the critical interface between the concrete foundations and the modular units installed by Reds10.

Precision was essential, with each plinth constructed to exact levels and dimensions in accordance with the structural design.

The accuracy achieved during this phase contributed significantly to the smooth installation of the modular building and ensured the structure was delivered exactly as intended.

Our experience working on modular construction projects means we understand the importance of achieving tight tolerances and delivering robust foundation systems capable of supporting long-term building performance.

The completion of the foundation and plinth package demonstrated Fry Site Services’ ability to deliver technically demanding modular building groundworks with the precision and attention to detail required within the education sector. The successful installation of the foundations and plinths provided the platform required for Reds10 to progress with the modular building installation safely and efficiently.

Groundworks SEND Modular

Comprehensive Surface Water and Foul Drainage Installation

One of the largest elements of the project involved the installation of extensive drainage infrastructure.
Educational facilities require reliable drainage systems to manage rainfall, prevent flooding and support day-to-day building operation. For this project, Fry Site Services delivered a complete package of surface water and foul drainage works.

The surface water drainage system was designed to efficiently collect and manage rainfall from the building and surrounding hard landscaped areas. This involved excavation, drainage pipe installation, inspection chambers and connection points throughout the scheme.

Alongside this, we installed a comprehensive foul drainage network incorporating drainage runs, chambers and manholes designed to serve the new teaching facility.

All drainage works were completed in accordance with current specifications and industry standards, ensuring the network provides a reliable and durable solution for many years to come.

The successful delivery of the drainage infrastructure provided the foundations for the next stages of construction and ensured the new SEND facility was equipped with a reliable and fully compliant network capable of supporting the long-term operation of the building.

Groundworks SEND Modular

Utility Infrastructure and Service Installations

Once drainage works were underway, attention turned to the installation of the utility infrastructure necessary to support the building.

Our team delivered a complete package of utility civils works, including new water services, electrical infrastructure and a gas diversion.

The water supply installation involved trench excavation, pipe laying and service routes to ensure the building had access to a reliable water supply upon completion.

The project also required a gas diversion to accommodate the construction of the new facility. Utility diversions often require careful planning and coordination, and our team successfully completed these works whilst maintaining programme requirements and ensuring all health and safety obligations were met.

In addition, Fry Site Services undertook the installation of electrical ducting and associated civils works required to service the power demands of the new SEND block.

These utility installations form the unseen infrastructure that enables the building to operate effectively and provide a safe, comfortable learning environment for pupils and staff.

Preparing the External Environment

With the foundations, drainage and utilities complete, works progressed to the external areas surrounding the building.

Creating safe, attractive and accessible outdoor spaces was a key objective of the project. SEND facilities require external environments that support mobility, safety and wellbeing whilst remaining durable enough to withstand frequent use.

Our team carried out further excavation and preparation works before installing Type 1 and Type 3 aggregate sub-bases across the designated playground and circulation areas.

The installation of these engineered sub-base layers provides the structural integrity required to support the finished surfacing whilst promoting effective drainage and long-term performance.

Materials supplied through RecMat helped support this phase of the project, ensuring quality aggregates were available when required and helping maintain construction progress.

Resin Bound Surfacing Installation

One of the most visually striking elements of the completed development is the extensive resin bound surfacing that surrounds the building.

As visible in the completed project photographs, the resin finish complements the timber-clad modular structure perfectly while creating smooth and accessible routes around the facility.

Resin bound surfacing offers numerous benefits for educational environments. It provides a durable, low-maintenance and slip-resistant finish capable of accommodating daily use whilst delivering an attractive appearance.

The finished resin pathways help create a welcoming environment and provide safe pedestrian circulation around the building.

The contrast between the resin surfaces and the surrounding landscaping creates a clean and modern aesthetic that significantly enhances the overall quality of the development.

Tarmac Pathways and Hard Landscaping

In addition to the resin surfacing, Fry Site Services installed a network of tarmac pathways around the SEND block.

These pathways provide clear pedestrian routes and help ensure accessibility throughout the site. Constructed on carefully prepared foundations, the pathways offer durability, reliability and ease of maintenance.

Concrete pin kerbs were installed as perimeter edging throughout the scheme to define various surfacing areas and provide long-term structural support.

The combination of resin surfacing, tarmac pathways and concrete kerbs creates an external environment that is both practical and visually appealing while remaining suitable for the specific requirements of a SEND educational setting.

Rubber Crumb Safety Surfacing

Safety was a key priority throughout the project, particularly within outdoor activity areas.

To support this objective, we installed specialist rubber crumb surfacing designed to provide enhanced impact absorption and improved safety for users.

Rubber crumb surfaces are widely utilised within schools due to their durability, resilience and ability to create comfortable and secure recreational spaces.

The finished installation contributes to the overall usability of the development whilst helping create a safe environment for pupils.

Outdoor Gym Equipment and Recreational Features

As part of the external works package, Fry Site Services installed three items of outdoor fitness equipment within the school grounds.

Visible within the completed project photographs, these facilities encourage physical activity and provide additional opportunities for outdoor engagement.

The equipment forms part of a wider strategy aimed at supporting wellbeing and creating an environment that promotes active learning and recreation.

Alongside the gym equipment, our team installed a new parasol that provides sheltered outdoor space suitable for education, relaxation and social interaction.

These additions help transform the area into far more than simply a circulation space, creating an enjoyable environment that can be utilised throughout the school day.

Sustainable Outdoor Furniture and Storage Facilities

The project also included the installation of a new recycled plastic picnic bench.

The use of recycled materials reflects the wider sustainability objectives often associated with modern educational developments and provides a durable seating solution requiring minimal maintenance.

In addition, Fry Site Services installed a new storage shed to provide practical external storage capacity for equipment and materials associated with the operation of the SEND block.

Together, these elements help ensure the outdoor environment remains both functional and enjoyable for staff and pupils.

Decorative Shingle and Stone Glue Finish

One of the final touches applied to the project involved the installation of decorative shingle around the perimeter of the building.

To create a more durable and secure finish, a specialist stone glue product was applied to bind the decorative aggregate together.

This innovative solution provides the visual appeal of loose decorative stone without the maintenance concerns often associated with traditional gravel installations.

The bonded finish helps prevent stone migration, improves safety and creates a neat, professional appearance around the timber-clad building.

As can be seen in the completed photographs, the decorative perimeter detailing contributes significantly to the finished appearance of the development and demonstrates the importance of quality finishing touches.

Landscaping and Field Reinstatement

The final stage of our works involved comprehensive landscaping and green space improvements.

Following completion of the hard landscaping package, the surrounding field areas were rotavated to improve soil structure and prepare the ground for reinstatement.

Premium British Standard topsoil was then imported and spread across the site to create an optimal growing medium.

The areas were subsequently seeded, creating new grassed spaces that will continue to establish and mature over time.

These works helped integrate the new development into its surroundings while creating attractive outdoor areas that complement the completed facility.

The Benefits of an Integrated Fry Group Solution

A major advantage on this project was the ability to utilise the combined strengths of Fry Site Services and RecMat.

Whilst Fry Site Services delivered the groundworks, civils and landscaping package, RecMat supported the scheme through waste management, aggregate supply and plant haulage services.

This integrated approach reduced reliance on multiple suppliers, improved coordination and enhanced programme efficiency throughout the construction process.

By bringing these complementary services together, Fry Group provides clients with a streamlined solution capable of supporting projects from early enabling works through to completion.

RecMat’s expertise in waste management, aggregate supply, recycled materials and plant haulage complemented the specialist groundworks and civil engineering capabilities of Fry Site Services, ensuring the project benefited from a coordinated approach from start to finish.

Another Successful Project Delivered for Reds10

The new SEND modular building in Farnborough stands as an excellent example of the quality, expertise and attention to detail that Fry Site Services brings to every project.

From the installation of thirty-six concrete foundation pads and blockwork plinths through to drainage infrastructure, utility installations, surfacing, landscaping and recreational features, our team delivered a comprehensive package that enabled the successful completion of this important educational facility.

Working alongside Reds10 and supported by RecMat, we successfully transformed an undeveloped space into a high-quality learning environment that will serve pupils, teachers and the wider school community for many years to come.

The completed development not only showcases our capabilities within the education and modular construction sectors but also reinforces our reputation as a trusted contractor for groundworks, civil engineering, drainage, utilities, surfacing and landscaping projects across the South East.

For modular construction providers, local authorities, academy trusts, schools and developers seeking a reliable groundworks contractor capable of delivering complete external works packages, this Farnborough SEND project is a clear demonstration of the expertise, quality and professionalism that Fry Site Services brings to every project.