Accessibility Improvements Delivered at Gallagher Stadium

Groundworks and Accessibility Upgrades for Maidstone United by Fry Site Services

Fry Site Services, part of the Fry Group, has delivered a full programme of groundworks and accessibility improvements for Maidstone United Football Club at Gallagher Stadium. The project included the construction of reinforced concrete pads for a new Portakabin facility, the installation of a DDA compliant ramp and steps, and the resolution of long standing drainage issues that had affected supporters on match days. Every part of the work was completed with a focus on safety, durability and ease of access, ensuring that all supporters can move around the stadium with confidence.

Careful Site Setup and Coordination Across the Fry Group

Working within a live stadium required careful planning and a well organised approach. The team created a clean and controlled working area that protected existing structures and maintained safe pedestrian routes throughout the programme. This allowed the stadium to continue operating normally and avoided any disruption to match day activities.

Coordination across the Fry Group played a key role in the smooth running of the project. RecMat supported the works by supplying aggregates and providing compliant waste removal services. Their reliable deliveries ensured that excavation arisings were removed quickly and that materials arrived as required. Information on Recmat is available at RecMat.

Fry MM also supported the scheme by transporting and handling bulk materials, including concrete and sub base. Their involvement kept the project moving at a steady pace and helped avoid unnecessary delays. More information on Fry MM can be found at Fry MM.

Construction of Reinforced Concrete Pads

One of the main construction tasks involved forming reinforced concrete pads to support the new Portakabin. These foundations had to be accurately set out and built to withstand long term structural loading. The team installed the reinforcement, formed the shuttering and placed the concrete with care. The result was a clean, level and hard wearing finish that now provides a strong base for the new building.

Before and during the work

Improved Accessibility with a DDA Compliant Ramp and Steps

A major aim of the project was to improve accessibility across the site. Fry Site Services installed a DDA compliant access ramp and steps, designed to allow all supporters, including those with limited mobility, to reach the new facility safely. The gradients, dimensions and finishes were all planned with accessibility in mind, and the new route ties in neatly with the existing surfaces to create a smooth and comfortable transition.

During this part of the work, Fry MEP provided technical assistance regarding buried services and potential mechanical considerations. Their support ensured that no underground services were affected during the excavation stages. Information on Fry MEP is available at Fry MEP.

Accessibility Improvements

Effective Resolution of Drainage Problems

The area outside the toilet block had suffered from water pooling for some time. This was particularly noticeable during wet periods or busy match days. Fry Site Services designed and installed a drainage solution to address the problem by improving the way surface water is collected and directed away from pedestrian routes. The improvement has already made a noticeable difference to the usability and safety of the space.

Recmat and Fry MM again supported this phase of the project by ensuring that materials arrived when required, helping the drainage installation to progress efficiently.

Delivering a Clean, Safe and Lasting Improvement

Once construction was complete, the site was fully cleaned, tidied and prepared for handover. The finished works now provide a safer, more accessible and more reliable area within Gallagher Stadium. The reinforced pads, improved access and upgraded drainage all contribute to a long term improvement for the club and its supporters and reflect the standard of workmanship that Fry Site Services brings to every project.

Strong Foundations for the Club and Its Supporters

This project highlights the capability of Fry Site Services to deliver well organised groundworks and community focused improvements across Kent, London and the South East. By combining structural expertise, accessibility upgrades and drainage solutions, the team has helped raise the standard of facilities at Gallagher Stadium. The coordinated support of Recmat, Fry MM and Fry MEP ensured the programme ran smoothly and to a high standard.

Strong foundations, so every supporter can enjoy the game.

Call the team

0330 4415 405

Email us

enquiries@frysiteservices.co.uk

Get in touch